Get Your Lesco New Connection Through Easy Steps

Hey there! Thinking about getting electricity for your home in Lahore? This article will make it easy for you. Whether you own a home or rent, having a LESCO Bill New connection is now simple. You can visit any LESCO office in your area or utilize the company’s online system on your phone or computer. This guide will cover the whole process from automatic to manual request submission in the Lesco office.

Easy and Quick LESCO New Connection Process

Want to know how to apply for a lesco new connection? LESCO has made it super simple with its online system. Lesco’s online new connection tracking makes it simple to check the status of your application through their site. The whole process usually takes around 30 to 73 days, depending on what type of connection you need.

The Process to Apply for a New LESCO Connection

Here is the step-by-step guide to applying for a new LESCO connection:

Visit the ENC System

To start your application, go to the Electricity New Connection (ENC) system online.

Lesco Bill New Connection 1

Fill out the application Form.

  • Select your connection type: Domestic, Commercial, Industrial, Agriculture, and others.
  • You will have to enter details like your name, CNIC, mobile number, address, and the neighbor’s electricity bill reference number. 
  • Choose your district and its subdivision.
  • Tell your relationship with the property (owner or tenant).

Upload Required Information

Upload all the needed documents in scanned copy. Make sure they are in JPG or PDF format and under 300 KB.

Submit the application

Review all the details and click submit once to send your application.

Print Your Application

Once the application form is completed, take a printout of that for further steps.

Attach supporting documents

Print the form and attach it with all relevant documents.

Submit to the relevant office

Send the entire file to your nearest LESCO office.

Get your demand notice

After the verification of the application, LESCO will issue a demand notice.

Pay the Demand Notice

Pay the demand notice at any designated bank. LESCO customers can also pay their DN online by selecting the PAY DN (Demand Notice) option on the ENC website.

Submit payment receipt

Give the payment receipt copy to the office concerned for processing.

Get your Lesco Bill New Meter

Once payment verification is done, LESCO will install your new connection.

Important Notes:

  • Incomplete or unclear applications may be rejected by LESCO.
  • Cancelling a permit without submitting false documents or information can result in putting you in legal danger.
  • New connection requests may be rejected at any time if unpaid dues are discovered.

If all steps are followed correctly, this process is supposed to be simple and efficient.

Here’s What You Need for LESCO Connection

Here’s a simple list of what you need to gather before applying:

First of all, you’ll need papers that show the house or shop is yours. This could be your Fard, Registry, or File – any of these work fine. If you can’t find these at home, just visit your local land office, and they’ll help you out.

Next, you’ll need a copy of your ID card (CNIC). Get it attested – you can do this at any bank, post office, or notary office nearby.

You also need someone to be your witness. This person should be someone you know well but not from your family. They’ll need to get their ID card attested, too.

Ask any neighbor for a copy of their recent LESCO bill. This helps LESCO know exactly where your place is.

Lastly, you’ll need a wiring test report. Think of it like a health checkup for your house’s wiring! Any licensed electrician can do this for you. If you don’t know one, LESCO can suggest some good ones.

Steps to Apply for LESCO Connection by Hand

Here’s an easy guide to getting your LESCO connection manually:

  • Get the application form

Print the application form for a new connection. You can get it from the LESCO office or their website.

  • Fill Out the Form

Read the form carefully. Then fill it with all the needed information and attach the necessary documents.

  • Submit the form.

After completing your form, take it to the nearest LESCO office. After you submit it, LESCO will verify the details. This process could take up to 15 days to finish.

  • Pay the Charges

After verification, LESCO will issue a demand notice. Submitted all other required documents and proof of payment for the charges mentioned in the notice.

  • Get Your Connection

Once done, LESCO will install your new connection.

Change Load, Change Connection Name, Change Tariff

Through the ENC portal, you can request a change of your existing connection details.

Here are the steps to update:

Visit the ENC Website: Go to enc.com.pk.

Select the Change Option: Choose the type of update: name, load, or tariff.

Complete the Form

  • For name, give old and new name details.
  • Give updated information for load or tariff changes.

Attach Required Documents: A copy of your CNIC.

Proof of property ownership. Latest electricity bill copy.

Submit and Print Application: Fill out the form, print it, attach the documents with it, and submit it to the LESCO office.

Print and Pay Demand Notice

For all connection changes:

  • You print the demand notice from the ENC portal.
  • You can pay it online or at designated banks.
  • Send the payment receipt to the portal to be verified.
  • Once your connection details have been verified, LESCO will update them.

LESCO New Connection Demand Notice Charges

The fee for the demand notice depends on the type of connection and meter.

  • Charges for a domestic single-phase meter begin at 10,500 rupees.
  • Charges for a three-phase meter vary from 33,500 rupees to 235,000 rupees, depending on the load and the requirements.

LESCO consumers can also download duplicate bills with the help of their CNIC number or reference number.

LESCO New Connection Charges 2024

The charge for a new LESCO connection will depend on the kind of connection you need and the load. Below is a simple breakdown:

Residential Connection

The fee for single-phase meters (up to 5 kW load) is PKR 5,000 to PKR 10,000.

The price depends on the installation requirements.

Commercial Connection

Charges for small businesses (up to 5 kW load) are PKR 10,000 to PKR 15,000.

Additional charges will be added for higher loads.

Industrial Connection

Charges vary for industries depending on the amount of load and installation requirements.

The fees can go up to PKR 50,000.

Additional Costs

You may also need to pay for:

  • Security deposits
  • Meter installation
  • Wiring and transformers

Charges can vary based on your location and needs, so contacting LESCO directly is the best method for getting the most exact details.

Service Line Charges for New General Connections (Tariff A1 & A2)

Single Phase Meter

Service Line LengthCharges
Up to 20 metersRs. 8,500/-
More than 20 meters and up to 30 metersRs. 10,500/-
More than 30 meters and up to 40 metersRs. 11,500/-
Above 40 meters and up to 100 meters (1 span LT with Ant Conductor and 1 Pole; excludes housing societies)Rs. 11,000 + Rs. 800/- per additional meter above 40 meters
Above 100 meters and up to 160 meters (2 spans LT with Ant Conductor and 2 Poles; excludes housing societies)Rs. 60,000 + Rs. 1,000/- per additional meter above 100 meters

Three Phase Meter

Service Line LengthCharges
Up to 20 metersRs. 36,500/-
Up to 30 metersRs. 43,000/-
Up to 40 metersRs. 50,000/-

LESCO Meter Connection Types and Load Categories

Load Categories

  • Up to 15 KW: Suitable for small household connections or low power usage.
  • Above 15 KW: For larger homes or businesses with higher power requirements.
  • Above 70 KW: For medium-sized businesses or industries needing significant power.
  • Above 500 KW: Used by large industries with heavy electricity demand.
  • Above 66 KV: For very large-scale industrial or corporate setups requiring high-voltage connections.

Connection Types

  • Domestic: For regular household electricity needs.
  • Agriculture: For farming and agricultural operations.
  • General Services: For service providers and small-scale businesses.
  • Commercial: For offices, shopping centers, and other commercial buildings.
  • Tubewell: Used for irrigation and water pumping.
  • Electrification Colonies: For areas set up with communal electricity.
  • Industrial: For factories and heavy industries.
  • Temporary: For short-term connections, such as events or construction sites.
  • Street Light: For street lighting in public areas.
  • Corporate Company: For large corporate entities needing high power.
  • Note: For industrial, commercial, and corporate company connections, you must provide your NTN and STRN.

Required Time For LESCO New Connection

CategoryTime Required
Voltage level up to 400V and Load to 15 kW30 days
Voltage level up to 400V and Load up to 70 kW53 days
Voltage level up to 400V and Load up to 500 kW73 days
Voltage level 11 or 33 KV and Load up to 5000 kW106 days
Voltage level up to 66 KV and Load above for all loads496 days

Common Issues While Getting New LESCO Connections

Here are some common problems during the new connection process with LESCO and their solutions:

Incomplete Documentation

Getting a new LESCO connection is a lot of paperwork, and this is what most people get stuck at. Most people forget to bring all the necessary papers or make errors when filling out forms. The most common mistakes include showing up with old ID cards instead of new ones, not knowing what sort of property papers you have, or not knowing how much electricity they’ll need. So, it’s best to check everything twice before submitting your file.

Lengthy Processing Times

Many people are worried because waiting for a new connection can take a long time. LESCO usually says they’ll give you a connection within 30-40 days, but it takes longer. This is because either too many people are applying at a time, or LESCO needs time to check if your area can be connected. You might have to wait even longer if you live in a new housing society for your Lesco bill registration.

Technical Site Issues

Getting a connection sometimes isn’t as easy as we think. If your house is far away from the main electricity lines or LESCO is not allowed to lay wires on someone else’s property, you might face problems. Another common problem is that the local transformer is not big enough to serve more houses, so LESCO has to upgrade it first.

Payment and Financial Concerns

People get confused about how much a new connection costs. It’s not just one fee; you pay for the connection, security money, and sometimes for new wires and poles. This is when people get confused because they do not know about these costs. The payment process is also tricky to understand. Just stay calm and use the lesco bill sms alert or their customer support for assurance of each payment.

Load Assessment Miscalculations

It’s very important to know how much electricity consumption you need. Some people want too much power and pay extra money for nothing. Others ask for too little, and then they have problems running multiple appliances. Getting this right from the start saves you both money and headaches later.

Conclusion

Getting a new LESCO connection is not always easy, but knowing what problems you might face can help you prepare better. The fastest way to get your connection is to have all your papers ready, keep in touch with LESCO staff, and be clear about how much electricity you need. It’s normal if things take time. But just make sure you’ve double-checked everything before you submit your application. Remember though, every house or building is different, so your process may be different than your neighbor’s. If you are patient and prepare well, you can easily get your electricity connection.

FAQs

  • Rs 8,500 for a service line up to 20 meters
  • Up to 30 meters and over 20 meters: Rs 10,500

The demand notice charge for a three-phase meter has been increased from Rs 33,500 to Rs 63,450, according to the LESCO administration.

It is an initial cost that new customers of a utility or communication service provider pay to cover the setup costs of their connection.

You will need an A&A Form (which is free to use in the Sub-Division)

 ii. Proof of Identity (any of these):(Voter card, Aadhaar card, passport, driver’s license, or government-issued photo identity). 

NOC may be necessary in the case of a connection in colonies.

Common tariff codes begin with either HT (high tension) or LT (low tension). ‘Low Tension’ connections, or LT codes, are typically utilized for personal offices and home connections only. ‘High Tension’ codes, or HT codes, are typically utilized for larger factories and industries.